- Learning Pentaho Data Integration 8 CE(Third Edition)
- María Carina Roldán
- 115字
- 2025-04-04 17:49:50
The Job metrics tab
The Job metrics tab shows, for each entry of the Job, several status, and information columns. For us, the most relevant columns in this tab are:

Note that the content of both the Logging and Job metrics tabs are color-coded:
- When there is an error, you see the lines in red
- When an entry succeeds, you can see the details in green
- If the log or metric is only informative, it is shown in a black font
Besides, the result of the execution of inpidual entries is represented with small ticks on top of the icons, as shown in the following screenshot:

Result of the execution of a Job